High and Low Temperature 3 Zones Thermal Shock Test Chamber

Product Details
Customization: Available
After-sales Service: Response Within 24 Hour
Warranty: 1 Year
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
5
Year of Establishment
2020-08-11
  • High and Low Temperature 3 Zones Thermal Shock Test Chamber
  • High and Low Temperature 3 Zones Thermal Shock Test Chamber
  • High and Low Temperature 3 Zones Thermal Shock Test Chamber
  • High and Low Temperature 3 Zones Thermal Shock Test Chamber
Find Similar Products

Basic Info.

Model NO.
CST200S
Application
Industry, Lab
Customized
Customized
Certification
CE, ISO, RoHS
Material
Stainless Steel
Type
Incubator
Temperature Range
-70~+150
Voltage
380V
Specification
150L
Trademark
ATEC
Origin
China
HS Code
8479899990

Product Description

High and Low Temperature 3 Zones Thermal Shock Test Chamber

    Today, the automotive industry accelerates electronic multi-functions.  According to this trend, safety standards such as ISO26262 and IEC61508 require high environmental stress that is generated by thermal shock chambers for higher reliability of vehicle equipment.
 
 
Model CST200S
Internal dimension (W*D*H) 600*600*550mm
External dimension (W*D*H) 1600*2500*2500mm
Heating Zone Temperature Range
 
H type: +50ºC ~ +150ºC  /  M type: +50ºC ~ +150ºC  /  H type: +50ºC ~ +125ºC   
Preheat Temperature(max) 200ºC 
Heating Time RT~ +200ºC  H type:≤30min  /  M type:≤40min  /  L type:≤50min
Cooling Zone Temperature Range H type:-65ºC  /  M type:-55ºC  /  L type:-40ºC
Preheat Temperature(max) -75ºC
Cooling Time RT~ -70ºC  H type:≤40min  /  M type:≤50min  /  L type:≤60min
Transfer time ≤10s
Temperature recovery time ≤5min
Optional:temperature function -65ºC ~ +150ºC
Heating speed 4ºC/min (average in no load at -55ºC ~ +85ºC)
Cooling speed 2ºC/min (average in no load at -55ºC ~ +85ºC)
Load (steel) 10kg
Temperature fluctuation ±0.5ºC
Temperature uniformity ±2ºC
Internal chamber material SUS304 stainless steel(1.5mm), fully welded seam, vapor impermeable.
External chamber material Spay steel(1.5mm)
Cooling method Water cooling
Controller LCD touch screen (internet function optional)
Compressor Tecumseh  compressor
Inspection window 450*450mm
Testing hole 1 *Ø50mm
Stainless Steel Shelf( 2pcs) Bearing 15kg/pc


Water-cooled type need installation conditions:
The customer must prepare water pipe and water tower (located outside) accordingly.
The water must be pure, or it will block the pipes and result in some maintenance trouble with time going.
It's often applied to large system with the features of better heat dissipation, longer service time, low noise but slightly higher price if count the fee of water tower and water pipes.

High and Low Temperature 3 Zones Thermal Shock Test ChamberHigh and Low Temperature 3 Zones Thermal Shock Test ChamberHigh and Low Temperature 3 Zones Thermal Shock Test ChamberHigh and Low Temperature 3 Zones Thermal Shock Test ChamberHigh and Low Temperature 3 Zones Thermal Shock Test ChamberHigh and Low Temperature 3 Zones Thermal Shock Test Chamber

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier