Environmental Test Chamber with Blower Motor Overload Protection

Product Details
Customization: Available
After-sales Service: After-Sales Service Available
Power Supply: 380V ± 10%/50Hz ±1(3p+N+G)
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
5
Year of Establishment
2020-08-11
  • Environmental Test Chamber with Blower Motor Overload Protection
  • Environmental Test Chamber with Blower Motor Overload Protection
  • Environmental Test Chamber with Blower Motor Overload Protection
  • Environmental Test Chamber with Blower Motor Overload Protection
  • Environmental Test Chamber with Blower Motor Overload Protection
  • Environmental Test Chamber with Blower Motor Overload Protection
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Company Profile
  • Workshop
  • Cooperation Cases
  • Other Products
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
CH1000CES/CH1000C-10ESS/CH1000-15ESS
Certification
ISO
Warranty
1 Year
Temperature Range
-70ºC~+150ºC
Temperature Fluctuation
±0.5ºC
Temperature Deviation
±2ºC
Temperature Uniformity
2ºC
Temperature Fast Change Rate
5/10/15 ºC/Min
Transport Package
Wooden Package
Specification
1000L
Trademark
ATEC
Origin
China
HS Code
8479899990

Product Description

High-low Temperature Fast Change Rate Chamber-(5/10/15ºC/min)
Product Description

Safety & Protections
Power supply undervoltage, over-voltage, missing phase, phase sequence error protection; 3 kinds of overtemperature protection; Heater short circuit protection; Compressor overpressure/overload/lack of oil protection; Humidifier fault protection; Blower motor overload/overheat protection; Panel over-current protection, earth leakage protection; cooling water shortage protection.

Application
It is used for electronics, electrical products and machine parts to do cold-resistant test, rapid changes in temperature or gradient test and especially used for electronics, electrical products to do environmental stress screening test.

Options
1. Special cable port, special shelf;
2. No humidity function(CH*TCES);
3. Dry air purge system;
4. Liquid nitrogen function.

Material
Exterior: Spay steel(1.5mm), white(with little gray) body, blue door.
Interior: SUS304 stainless steel(1.5mm), fully welded seam, vapor impermeable.
Heat insulation: Double insulation, thickness 125mm (Polyurethane foam board, without asbestos mineral fibers)
 
Product Parameters
Parameters for all models
High-low Temperature Fast Change Rate Chamber-(5ºC/min)
Model Number CH250CES CH340CES CH500CES CH1000CES CH1500CES CH2000CES
Interior capacity(L) 250L 340L 500L 1000L 1500L 2000L
Performance Temperature Range -70ºC~+150ºC
Humidity Range Environmental Test Chamber with Blower Motor Overload Protection
Temperature Fluctuation ±0.5ºC
Temperature Deviation ±2ºC
Temperature Uniformity 2ºC
Humidity Deviation -3~+2%R.H.(>75%R.H.),±5%R.H.(≤75%R.H.)
Remark Above measured at ambient temperature 20±2ºC,no load,
Standard  load
(Unit:kg,aluminum ingots)
10 15 25 50 75 100
Heating/cooling Rate 5ºC/min(average value,with standard load,-55~+85ºC)
Interior Size (mm) D 500 600 700 1000 1000 1000
W 700 750 850 1000 1000 1100
H 750 750 850 1000 1500 1800
Exterior Size
(mm)
D 1550 1650 1800 2200 2500 2600
W 950 1000 1100 1250 1250 1350
H 1650 1650 1850 1980 1900 2200
Casters 4 casters(exterior size above not include casters,casters increased 50-120mm)
Inspection window 450×450 with heating device to prevent condensation and frost
Cable Port φ80×1,on the right side of chamber(facing door)
Stainless Steel Shelf(2pcs) Load bearing 20kg/each Load bearing 35kg/each
Internal Lighting 35W/12V 2*35W/12V
Sub-Controller Energy saving method Independent PID regulation of cooling and heating(i.e.heating no refrigeration,refrigeration no heating,saving 30%than BTC)
Heating Electrical heating(3 kinds of overtemperature protection)
Humidification Steam humidification(water consumption 0-500ml/day)
Refrigerating imported brand compressor (BITZER)
Refrigerant  Environmentally friendly refrigerants:R404A+R23
Condenser  water-cooled,water termperature7~28ºC,water pressure 0.1~0.3Mpa
Controller Controller  7'color touch screen,resolution 800×480,on the top of window
Control Mode  Program and fixed value
Program capacity  200×100,cycle,skip,maintain,link
Sensor  PT100
Communication  RS485 or LAN interface,USB interface is standard configuration,with host software
Curve function  Auto recorded by touch screen
Power supply  380V±10%/50HZ±1(3P+N+G)
Rated Current(A) 23 28 33 48 55 65
Installed power(kw) 13 15 18 28 34 42
Weight(kg) 420 600 900 1300 1900 2600
High-low Temperature Fast Change Rate Chamber-(10ºC/min)
Model   Number CH250C-10ESS CH340C-10ESS CH500C-10ESS CH1000C-10ESS CH1500C-10ESS CH2000C-10ESS
Interior capacity(L) 250L 340L 500L 1000L 1500L 2000L
Performance Temperature Range -70ºC~+150ºC
Humidity Range Environmental Test Chamber with Blower Motor Overload Protection
Temperature Fluctuation ±0.5ºC
Temperature Deviation ±2ºC
Temperature Uniformity 2ºC
Humidity Deviation -3 ~+2%R.H.(>75%R.H.),±5%R.H. (≤75%R.H.)
Remark Above measured at ambient temperature 20±2ºC,no load,
Standard  load
(Unit:kg,aluminum ingots)
10 15 25 50 75 100
Heating/cooling Rate 10ºC/min(average value,with standard load,-55~85ºC)
Interior Size
(mm)
D 500 600 700 1000 1200 1400
W 700 750 850 1000 1100 1200
H 750 750 850 1000 1100 1200
Exterior Size
(mm)
D 1700 1800 2200 2650 2700 2900
W 950 1000 1100 1250 1350 1450
H 2000 2000 2200 2450 2550 2650
Casters  4 casters(exterior size above not include casters,casters increased 50-120mm)
Inspection window 450×450 with heating device to prevent condensation and frost
Cable Port φ80×1,on the right side of chamber(facing door)
Stainless Steel Shelf(2pcs) Load bearing 20kg/each Load bearing 35kg/each
Internal Lighting  35W/12V  2*35W/12V
Operation Environment 0~40ºC
Sub-Controller Energy saving method Independent PID regulation of cooling and heating(i.e.heating no refrigeration,refrigeration no heating,saving 30%than BTC)
Heating Electrical heating(3 kinds of overtemperature protection)
Humidification Steam humidification(water consumption 0-500ml/day)
Refrigerating imported brand compressor (BITZER)
Refrigerant Environmentally friendly refrigerants:R404A+R23
Condenser water-cooled(water temperature:7~28ºC,water pressure 0.1~0.3MPa)
Controller   Controller 7'color touch screen,resolution 800×480,on the top of window
  Control Mode Program and fixed value
Program capacity 30×50,cycle,skip,maintain,link
Sensor PT100+Capacitive Humidity Sensor
  Communication RS485/RS232 interface,USB interface is standard configuration,with host software
Curve function auto recorded by touch screen
Power supply 380V±10%/50HZ±1(3P+N+G)
Rated Current(A) 36 48 70 95 110 130
Installed power(kw) 19 27 48 62 74 95
Weight(kg) 600 850 1550 2100 2600 3400
High-low Temperature Fast Change Rate  Chamber-(15ºC/min)
Model   Number CH250-15ESS CH340-15ESS CH500-15ESS CH1000-15ESS
Interior capacity(L)   250L 340L 500L 1000L
Performance Temperature Range -70ºC~+150ºC
Humidity Range Environmental Test Chamber with Blower Motor Overload Protection
Temperature Fluctuation ±0.5ºC
Temperature Deviation ±2ºC
Remark Above measured at ambient temperature 20±2ºC,no load
Temperature Uniformity 2ºC
Humidity Deviation -3~+2%R.H.(>75%R.H.),±5%R.H.(≤75%R.H)
Standard  load
(Unit:kg,aluminum ingots)
10 15 25 50
Heating/cooling Rate 15ºC/min(average value,with standard load,-55~85ºC)
Interior Size(mm) D 500 600 700 1000
W 750 750 850 1000
H 750 750 850 1000
Exterior Size (mm) D 2000 2300 2200 2800
W 1000 1000 1100 1250
H 2100 2100 2200 2500
Casters 4 casters(exterior size above not include casters,casters increased 50-120mm)
Inspection window 450×450 with heating device to prevent condensation and frost
Cable Port φ80×1,on the right side of chamber(facing door
Stainless Steel Shelf(2pcs) Load bearing 20kg/each Load bearing 35kg/each
Internal Lighting   35W/12V
Operation Environment   0~40ºC
Sub-Controller Energy saving method Independent PID regulation of cooling and heating(i.e.heating no refrigeration,refrigeration no heating,saving 30%than BTC)
  Heating Electrical heating(3 kinds of overtemperature protection)
Humidification Steam humidification(water consumption O-300ml/day)
Refrigerating Imported brand compressor (BITZER)
Refrigerant Environmentally friendly refrigerants:R404A+R23
Condenser water-cooled(water temperature:7~28ºC,water pressure 0.1~0.3MPa)
Controller Controller 7'color touch screen,resolution 800×480,on the top of window
Control Mode Program and fixed value
Program capacity 30×50,cycle,skip,maintain,link
Sensor PT100+Capacitive Humidity Sensor
Communication RS485/RS232 interface,USB interface is standard configuration,with host software
Curve function auto recorded by touch screen
Power supply   380V±10%/50HZ±1(3P+N+G)
Rated Current(A) 48 56 80 130
Installed power(kw) 31 38 63 92
Weight  (kg) 900 1200 1700 2400
Company Profile

Environmental Test Chamber with Blower Motor Overload Protection

Founded in 2003, Chongqing ATEC Technology Co., Ltd. (hereinafter referred to as ATEC) is a national-level innovation-oriented hi-tech enterprise specially committed to the research on testing the reliability of the latest global techniques and the equipment for the simulation of climate and environment. ATEC is the first domestic listed company specialized in climatic & environmental testing equipment.

Since 2006, ATEC has established a joint venture with Italian Angelantoni Group to develop and manufacture the world's most advanced environment testing equipment and undertaken the reliable environment test engineering. In October 2013, ATEC repurchased all the shares of Italian Angelantoni, vigorously took in the world's advanced environmental simulation technology and stringent quality control concept, and had them optimized and innovated. This enabled ATEC to become an innovation-oriented well-known enterprise with completely proprietary intellectual property rights. In addition to that, ATEC's product technical strength and technological level also "take the leading position in China and become internationally advanced."

ATEC not only researches and develops, designs, and manufactures the whole series of climatic environmental testing equipment but also provides solutions for various kinds of climatic and environmental simulation testing engineering. The main products include high-/low-temperature humidity chamber, temperature shock chamber, low-pressure chamber, chamber combined with temperature/humidity/vibration, single-shaft and multi-shaft rotary temperature chamber, rainfall/dust/light/salt spray environment simulation system, vehicle climate/environment simulation and detection system, multi-factor environment simulation system, and various kinds of non-standard testing systems, etc.

ATEC was honored as "national high-tech enterprise" and provided with the innovation funds from the State Scientific and Technological Commission. It has several technical patents, passes ISO9001:2008 quality management system certification, and can produce environment testing equipment that conforms to various kinds of international standards, such as MIL, IEC, and DIN. The products are widely applied in national key laboratories and large-scaled third-party testing laboratories involving aviation, aerospace, armament, vessel, automobile, intelligent manufacturing, new energy, measurement electronics, railway, health care, academic institutions, and many other important fields of the national economy.
Environmental Test Chamber with Blower Motor Overload Protection

Workshop

Environmental Test Chamber with Blower Motor Overload Protection

Cooperation Cases

Environmental Test Chamber with Blower Motor Overload Protection

Other Products

Environmental Test Chamber with Blower Motor Overload Protection

Environmental Test Chamber with Blower Motor Overload Protection
Certifications

Environmental Test Chamber with Blower Motor Overload Protection

Environmental Test Chamber with Blower Motor Overload ProtectionEnvironmental Test Chamber with Blower Motor Overload Protection
FAQ

1.Do you accept OEM (Original Equipment Manufacturer) service?
Yes we accept any OEM service since we are a professional manufacturer for medical equipment with about more than 10 years of OEM experiences.
 
2.What kind of guarantee do you offer?
We provide 1 year warranty for all our items.
 
3.How to deal with the faulty?
First, our products are produced in strict quality control system, but if any faulty, we'll send new spare parts for free in 1 warranty year.
 Secondly, our after-sales department will periodically follow up customers.
 
4.What should I do if I do not know how to use?
Please do not worry, manual user will be sent together, you can also contact us with more technological support.
 
5.Why should you buy from us?
ATEC group, founded in 2003 and been through high and stable development for 20 years, who is now with revenues of one hundred million, 2000 employees in China and abroad offices, 22.4 acres land industry parks and 20000 square meters production base. 
 
6.When can I get the price?
We usually quote as soon as we get your inquiry. If you need urgent reply, please tell us your email or Wechat account, we will contact you ASAP.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier